$32.00 – $80.00
Description
Make a statement in any room with this framed poster, printed on thick, durable, matte paper. The matte black frame adds an extra touch of class.
• Alder, Semi-hardwood frame
• Black in color
• .75” thick
• Acrylite front protector
• Lightweight
• Hanging hardware included
Additional information
Weight | N/A |
---|